Our great team of riggers have erected the concrete tilt panels at St James today. They have erected the concrete tilt panels in a timely and safe manner, great job Peter and the boys from Pemac crane hire.
Tilt Panels Are Now Up
Previous post: New Building WA – Ground slab down at St James!
Next post: ‘LOOK’ at these panels being lifted













